Highland Drive (Driggs Avenue to City Line)

Posted on: March 8th, 2023

During a pavement maintenance project on Highland Drive, Salt Lake City redesigned the road paint layout from Driggs Avenue to the City limit.

300 East (500 South to 1300 South)

Posted on: March 8th, 2023

Project Update: We have final street designs for 300 East! The project team “brought it” with this design. You love your parking-protected bicycle lanes and hate the discomfort of inconsistent bicycle lane treatments. Therefore 300 East will have the following enhancements: The new 300 East design will provide a safer and more comfortable experience for […]

200 West / Wall Street (400 North to 300 West)

Posted on: March 8th, 2023

Overview The project team is analyzing 200 West / Wall Street from 400 North to 300 West to determine if there are opportunities to further enhance the bicycling experience. In the coming months, the project team will communicate with residents and the Community Council about our findings as well as ways for the public to […]

Sunnyside Avenue (Foothill Drive to City Limits)

Posted on: March 8th, 2023

Overview Sunnyside Avenue, between Foothill Drive and the City limits, will be chip sealed in Summer 2021. A chip seal adds another layer to the roadway surface, prolonging the life of the roadway by 5-7 years. A chip seal also provides a blank slate and opportunities to rethink the striping for travel lanes, turn lanes, […]

400 South (I-15 to Redwood Road)

Posted on: March 8th, 2023

Overview 400 South, from I-15 to Redwood Road, will be chip sealed in Summer 2021. A chip seal adds another layer to the roadway surface, prolonging the life of the roadway by 5-7 years. The project team decided to make very minor adjustments to the roadway. The configuration of two travel lanes and a center turn […]

200 East (600 South to 1300 South)

Posted on: March 8th, 2023

Project Update: We have final street designs for 200 East! We heard from local businesses and residents the need for more on-street parking while still accommodating vehicle mobility and increasing bicycle comfort and pedestrian-friendly areas. Based on feedback and street vehicle volumes, the new street design will have the following enhancements:  This resurfacing design is […]

1000 West (North Temple to 600 North)

Posted on: March 8th, 2023

Overview The project team is analyzing 1000 West from North Temple to 600 North to determine if there are opportunities to leverage the resurfacing opportunity to make changes recommended by the Pedestrian and Bicycle Master Plan. In the coming months, the project team will communicate with residents and the Community Council about our findings as […]

Parley’s Way (2300 E to I-80)

Posted on: March 16th, 2020

In 2020, Salt Lake City resurfaced Parley’s Way and added buffered bike lanes, median islands, colored crosswalks, and crossing beacons.

1000 West (600 North to North Temple)

Posted on: March 12th, 2020

Salt Lake City resurfaced 1000 West from 600 North to North Temple in the summer of 2021.

500 East (900 S to 1300 S)

Posted on: March 12th, 2020

This street received a surface treatment in the summer of 2020. Community input about this street In Spring 2020, Salt Lake City gathered community input for possible changes to the striping design of this street. Thanks to everyone for participating in our survey for the street resurfacing projects. For the 500 East project, our major takeaways […]