400 South, from I-15 to Redwood Road, will be chip sealed in Summer 2021. A chip seal adds another layer to the roadway surface, prolonging the life of the roadway by 5-7 years. The project team decided to make very minor adjustments to the roadway. The configuration of two travel lanes and a center turn lane will be kept in place, but narrowed very slightly to accommodate a buffer in the existing bike lane. This will result in no reduction to existing parking and no major changes to the streetscape.

Draft Design

The project team has released the following draft striping plan for this section of 400 South:

What’s Coming for 400 South?

The same corridor will likely experience bigger changes in 2022 due to a Community Development Block Grant (CDBG) received in 2021. Design is still in process, but the street will feature on-road bus boarding islands with protected bike lanes. Stay tuned for future updates.

Share "400 South (I-15 to Redwood Road)" to your social network: