Salt Lake City

MyStreet

MyStreet | Email: mystreet@slcgov.com

Completed Street Projects

2100 East: 1700 South to Parkway Avenue

Posted on: June 27th, 2018

  Overview This pavement reconstruction project replaced the deteriorating asphalt to increase roadway longevity and safety for travelers. Other project features included upgrades to pedestrian ramps and new pavement markings to improve access and travel experience. Schedule Design: early 2018 Contractor Selection: spring 2018 Project Completion: summer 2018 Project Photos Before After Contact Information Civic […]

1500 East: 900 South to 1300 South

Posted on: June 27th, 2018

  Overview This project reconstructed the asphalt pavement along this segment of 1500 East to increase roadway longevity and safety for travelers. Other project features included new pavement markings and upgrades to access ramps and curb and gutter to improve travel experience and drainage conditions. Project Map Project Photos Before After Schedule Design: early 2018 Contractor […]

Wilmington Avenue: Highland Drive to 1300 East

Posted on: June 27th, 2018

Overview This roadway project reconstructed the deteriorating asphalt pavement with concrete to increase its longevity and safety. Other project features included a new sewer line, as well as crosswalks, access ramps and sidewalks with curb and gutter to improve walkability and drainage.   Investment $550,000 Schedule Design: winter 2017 Contractor Selection: spring 2018 Project Completion: […]

Paver Crosswalk Reconstruction

Posted on: June 27th, 2018

Overview This project replaced various brick crosswalks with stamped concrete to increase their longevity and improve safety and visibility at the following locations: 1300 South and 1900 East 200 West and South Temple West Temple and South Temple 100 South and Main Street 300 West and South Temple 150 South Main Street 200 South Main […]

1200 East: 600 South to 800 South

Posted on: June 27th, 2018

Overview This project installed a raised median to improve safety, mobility and predictability in the neighborhood. As part of the project, crews also resurfaced the pavement with new asphalt to prolong its longevity. The new median is a continuation of the one between 300 South and 500 South, and it will improve access and aesthetics […]

Genesee Avenue: 900 West to 1000 West

Posted on: June 27th, 2018

Overview This project upgraded an underground water line to improve water quality and service to area residents. The new road was built with a concrete pavement and is expected to last up to 40 years. As part of the project, crews widened the sidewalks to make it easier and safer to walk and ride a […]

Gladiola Street: 500 South to 900 South

Posted on: June 27th, 2018

Overview This road construction project reconstructed this busy segment of Gladiola Street to improve safety, mobility and drainage in the area. The new concrete pavement is built to last approximately 50 years and is able to better withstand the heavy trucks that travel this industrial district. Investment $3 Million Schedule Design: winter 2017 Contractor Selection: […]