Project Summary

Location: Citywide
Design Consultants: TBD
Contractor: TBD
Funding: CIP
Project Manager: Kyle Shields – kyle.shields@slcgov.com
Project Description: The following upgrades will be made to various playgrounds around Salt Lake City:

  • 6th East Mini Park – replace sand with something else to help the compaction issue
  • Davis Park – replace tiles with engineered wood fiber surface and add ADA ramp
  • Laird Park – new sandbox, remove pour in place surface, replace with engineered wood fiber surface and add ADA ramp
  • Miami Park – remove tile, add engineered wood fiber surface and add ADA ramp
  • Popperton Park – replace sand with engineered wood fiber surface and add ADA ramp
  • Sunnyside Park – add ADA ramp onto the swing set area
  • Warm Springs Park – remove tile, add engineered wood fiber surface and add ADA ramp

 