Current Street Projects

Surface Treatment Projects

Posted on: May 13th, 2024

Each year, the Salt Lake City Streets Division strives to resurface 130 lane miles of Salt Lake City roadway to prolong the lifespan of the street network.

Read More

Street Reconstruction Projects

Posted on: May 12th, 2024

Each year, Salt Lake City reconstructs numerous streets, made possible by the 2018 voter-approved Funding Our Future street reconstruction bond.

Read More

600/700 North Reconstruction (800 West to Redwood Road)

Posted on: May 10th, 2024

Salt Lake City will rebuild 600/700 North from 800 West to Redwood Road starting in 2025. The street is being designed to improve safety, provide more comfortable facilities for people walking, biking, and using transit, and to create a more welcoming corridor.

Read More

300 North (300 West to 1000 West)

Posted on: January 3rd, 2024

In 2024, 300 North will be reconstructed from 300 West to 1000 West. Pavement, sidewalk, ADA ramps, bike lanes, and curb and gutter will be replaced to create a safe, comfortable environment for everyone using the road.

Read More

2100 South Reconstruction (700 East to 1300 East)

Posted on: January 3rd, 2024

In 2024, Salt Lake City is reconstructing 2100 South from 700 East to 1300 East to replace the aging pavement and improve transit, pedestrian, and bicycle facilities.

Read More

Virginia Street Reconstruction (South Temple to 11th Avenue)

Posted on: January 3rd, 2024

Virginia Street from South Temple to 11th Avenue will be reconstructed in 2024. Key components of the design concept include continuous sidewalks on the west side, uphill bike lanes, traffic calming elements, improved bus stops, and intersection safety improvements.

Read More

West Temple Reconstruction (North Temple to 400 South)

Posted on: January 3rd, 2024

The West Temple reconstruction project will rehabilitate the aged pavement from North Temple to 200 South and provide additional features to make the road safer for those driving, walking, and biking from North Temple to 400 South.

Read More

1300 East (2100 South to 3300 South)

Posted on: January 3rd, 2024

Salt Lake City completed an environmental study to evaluate design options and select improvements for 1300 East between 2100 South and 3300 South. The study will help the team identify gaps in the existing transportation network; challenges faced by those traveling between Sugar House and Millcreek; and improvements for vehicle, pedestrian and bike mobility and safety. Construction is scheduled for 2025.

Read More

Highland Drive Reconstruction (Warnock Avenue to Logan Avenue)

Posted on: February 16th, 2023

Highland Drive will be reconstructed in 2023 as part of the Funding Our Future bond. This provides a unique opportunity to implement a roadway design that creates safe, inviting, sustainable, and comfortable travel choices, while providing the last needed connection to the Parley’s Trail in Salt Lake City.

Read More

200 South Reconstruction –  Transit Priority Corridor & Complete Street

Posted on: February 16th, 2023

As part of the 2018 voter-approved Funding Our Future street reconstruction bond, Salt Lake City will start to reconstruct 200 South beginning in 2022. The 200 South Reconstruction project design considers the variety of needs of a functional downtown, urban core and will rebuild 200 South to improve mobility and safety for all users.

Read More

900 South: 900 West to Lincoln Street (945 East)

Posted on: February 16th, 2023

As part of this project, the 9-Line Trail corridor will be an attractive, safe, and inclusive place for neighbors, businesses, and street users. A new trail will also introduce a walking and bicycling connection between east and west Salt Lake City, linking neighborhoods, business districts, and cultural destinations.

Read More

1100 East Reconstruction: 900 South to Logan Ave (1600 South)

Posted on: December 12th, 2022

This project will reconstruct roadway pavement, sidewalks, and gutters; and provide safety improvements, traffic calming features, and bicycle lanes along 1100 East.

Read More

Sugar House Construction Projects

Posted on: February 2nd, 2022

See what roadway construction projects are happening in the Sugar House neighborhood over the next few years.

Read More

Alleyway Pilot Program

Posted on: September 28th, 2021

In 2021, work began on on the first alleyway in Salt Lake City that will be rejuvenated through the City’s Alleyway Pilot Program. Construction on the 850-foot alley in the Liberty Wells neighborhood will increase functionality for the adjoining residents as well as the communities the alley connects.

Read More

Completed Street Projects