1100 West Reconstruction

Responsive Margin

June 2026 update: Construction is underway with concrete removal and replacement happening now. Work on trail and roadway will follow.

Overview

Salt Lake City will reconstruct 1100 West between Hayes Avenue and American Avenue. Work will include full reconstruction of the asphalt roadway and a surface treatment on the Jordan River Trail Curb ramps will be reconstructed to meet current ADA standards. Sidewalk, driveway approaches, curb, and gutter will be replaced as needed. See map below for specific locations of work. Construction is expected to take approximately 4–5 weeks to complete.

Map of the 1100 West reconstruction project in Salt Lake City. The project includes new asphalt pavement through the street. Concrete work will be done near 948 1100 West, 950 1100 West, 956 1100 West, and 958 1100 West.

Improvements include

  • New asphalt to replace worn pavement
  • Repairs to sidewalks, curbs, gutters, curb ramps, and driveway approaches as needed
  • Repairs to the Jordan River Trail to improve safety as well as walkability and bikeability.

What to Expect During Construction

  • Daytime construction noise, dust and intermittent access limitations Monday to Friday while reconstruction is taking place
  • 7 day cure time on new concrete infrastructure, including drive way approaches
  • On-street parking restrictions

Landscaping and Irrigation

Landscaping may be disturbed during construction. The project team will restore impacted landscaping in kind. This may include replacing grass with seed or sod and replacing flowers, bushes, or shrubs with the same or a similar species and size. If you have questions about landscape restoration, please contact the project team at [email protected].

Construction will take place adjacent to front yards, park strips, and other landscaped areas where irrigation is present. Crews will do their best to avoid irrigation lines and sprinkler heads. We proactively look for and repair irrigation issues caused by construction, but if you notice a problem that has not yet been addressed, please contact the project team. If irrigation infrastructure is damaged during construction, we will coordinate repairs. The project team cannot reimburse for repairs completed by third parties.

Trash Service

Garbage collection will continue as normal. Please set your bins out as usual, crews will move them if needed.