July 2026 Update: Construction is expected to begin week of July 27. Work with begin with median curb reconstruction.

Overview

Salt Lake City will reconstruct 1200 East between 500 South and 300 South. Work will include full reconstruction of the asphalt roadway and median improvements. Curb ramps will be reconstructed to meet current ADA standards. Sidewalk, driveway approaches, curb, and gutter will be replaced as needed. See map below for specific locations of work. Construction will continue through October 2026.

Map of the1200 East Reconstruction in Salt Lake City. The project includes new asphalt pavement from 500 South to 400 South. Concrete work will be done near of the adjoining sidewalks, curb, gutter, and drive approaches of this section of the street.
Map of the1200 East Reconstruction in Salt Lake City. The project includes new asphalt pavement from 400 South to East Broadway Street. Concrete work will be done near of the adjoining sidewalks, curb, gutter, and drive approaches of this section of the street.

Improvements include

  • New asphalt to replace worn pavement
  • Repairs to sidewalks, curbs, gutters, curb ramps, and driveway approaches as needed
  • Repairs to the 1200 East median to improve drainage and safety

What to Expect During Construction

  • Daytime construction noise, dust and intermittent access limitations Monday to Friday while reconstruction is taking place
  • 7 day cure time on new concrete infrastructure, including drive way approaches
  • On-street parking restrictions
  • Park strip landscaping remediation will take happen in spring 2027

Landscaping and Irrigation

Landscaping may be disturbed during construction. The project team will restore impacted landscaping in kind. This may include replacing grass with seed or sod and replacing flowers, bushes, or shrubs with the same or a similar species and size. If you have questions about landscape restoration, please contact the project team at [email protected].

Construction will take place adjacent to front yards, park strips, and other landscaped areas where irrigation is present. Crews will do their best to avoid irrigation lines and sprinkler heads. We proactively look for and repair irrigation issues caused by construction, but if you notice a problem that has not yet been addressed, please contact the project team. If irrigation infrastructure is damaged during construction, we will coordinate repairs. The project team cannot reimburse for repairs completed by third parties.

Trash Service

Garbage collection will continue as normal. Please set your bins out as usual, crews will move them if needed.