Charlton Circle

Responsive Margin

July 2026 Update:  Concrete work is wrapping up and is expected to be complete the week of July 13. Crews will then begin repaving the roadway by excavating and grading the road, stabilizing the road base with a slurry treatment, and placing new asphalt. The paving process will take 2-3 weeks to complete.

Overview

Salt Lake City will reconstruct Charlton Circle from 900 East to its terminus. Work will include full reconstruction of the asphalt roadway as well as upgrading curb ramps to meet current ADA standards. Sidewalk, driveway approaches, curb, and gutter will be replaced as needed. See map below for specific locations of work. Actual work activities may vary as real word project conditions evolve. Construction schedules are subject to change due to weather, site conditions, and material availability.

Map of the Charlton Circle reconstruction project in Salt Lake City. The project includes new asphalt pavement through the street. Concrete work will be done near 2783 900 East, 905 Charlton Circle, 915 Charlton Circle, 918 Charlton Circle, 921 Charlton Circle, 928 Charlton Circle, 931 Charlton Circle, 938 Charlton Circle, 941 Charlton Circle, and 948 Charlton Circle.
Map of the Charlton Circle reconstruction project in Salt Lake City. The project includes new asphalt pavement through the street. Concrete work will be done near 951 Charlton Circle, 956 Charlton Circle, 959 Charlton Circle, 966 Charlton Circle, 967 Charlton Circle, and 972 Charlton Circle.

Improvements include

  • Repairs to sidewalks, curbs, gutters, curb ramps, and driveway approaches as needed
  • New asphalt to replace worn pavement

What to Expect During Construction

  • Daytime construction noise, dust and intermittent access limitations Monday to Friday while reconstruction is taking place
  • 7 day cure time on new concrete infrastructure, including drive way approaches
  • On-street parking restrictions

Landscaping and Irrigation

Landscaping may be disturbed during construction. The project team will restore impacted landscaping in kind. This may include replacing grass with seed or sod and replacing flowers, bushes, or shrubs with the same or a similar species and size. If you have questions about landscape restoration, please contact the project team at [email protected].

Construction will take place adjacent to front yards, park strips, and other landscaped areas where irrigation is present. Crews will do their best to avoid irrigation lines and sprinkler heads. We proactively look for and repair irrigation issues caused by construction, but if you notice a problem that has not yet been addressed, please contact the project team. If irrigation infrastructure is damaged during construction, we will coordinate repairs. The project team cannot reimburse for repairs completed by third parties.

Trash Service

Garbage collection will continue as normal. Please set your bins out as usual, crews will move them if needed

Contact us

Email: [email protected]

Phone: 801-535-6666

Project Engineer: Kathryn Swanson