1200 East Reconstruction (600 South to 800 South)

Responsive Margin

You are viewing archived content. Please note that this content is no longer updated and links may not work.

Overview

The 1200 East project, from 600 South to 800 South, installed a raised median to improve safety, mobility, and predictability in the neighborhood. The project also resurfaced the roadway with new asphalt to extend pavement life. The new median continues the existing median between 300 South and 500 South and improves access and aesthetics in the area. The project was designed in winter 2017 and constructed in summer 2018.