1200 East Reconstruction (600 South to 800 South)

Responsive Margin

You are viewing archived content. This content is no longer updated and links may not work.

Overview

The 1200 East project, from 600 South to 800 South, installed a raised median to improve safety, mobility, and predictability in the neighborhood. The project also resurfaced the roadway with new asphalt to extend pavement life. The new median continues the existing median between 300 South and 500 South and improves access and aesthetics in the area. The project was designed in winter 2017 and constructed in summer 2018.

The old pavement on 1200 East before the street reconstruction.
A new landscaped median in the middle of 1200 East.