Accessibility updates

Responsive Margin

Accessibility updates for Salt Lake City infrastructure

This page will share updates anytime Salt Lake City has to close or reroute ADA-accessible sidewalks, ramps, or pathways because of construction or maintenance.

Updates will be posted by the City’s Engineering, Streets, or Transportation Divisions as projects happen.


Current closures

300 North pedestrian bridge

The elevator of the pedestrian and bike bridge over the railroad tracks at 300 North and 500 West will be temporarily closed each night.

Closure details

  • Type of closure:
    • Only the elevator will not be accessible during the recurring nightly closures. The pedestrian and bike bridge will remain open.
  • Time of closure:
    • The elevator will close daily at 9:00 p.m., and re-open daily at 5:00 a.m.
  • Closure reason:
    • Due to damage sustained at this location, we are conducting necessary repairs to ensure safety and accessibility for all users.
  • Accessibility impact:
    • This closure temporarily removes an accessible route, which may impact individuals using wheelchairs, walkers, or other mobility aids.
  • Date(s) of closure:
    • This closure is effective August 25, 2025. A date for this closure to end has not been announced.
  • Available detours or alternate routes:
    • An accessible detour is the marked crosswalk across the railroad tracks directly under the pedestrian bridge. Users must abide by the railroad crossing signals at all times. Please plan for additional travel time.

Division contact

The Facilities Division is managing this temporary closure. For questions or concerns, contact them by phone at 801-535-7280 or email [email protected].


Top resources

General questions or concerns that a Salt Lake City program, service, or activity is not accessible to persons with disabilities should be emailed to [email protected].

Contact us

Contact the Engineering Division by:


Contact the Streets Division by:


Contact the Transportation Division by:

Responsive Margin