Responsive Margin In October 2018, Salt Lake City’s Engineering Division adopted the 2017 edition of the APWA Manual of Standard Plans and Manual of Standard Specifications, with these exceptions: The Engineering Division requires all construction in the public right-of-way to conform to these standards. For questions about these standards or the exceptions, please contact the Engineering […]
Job No. 105055: General Fund Accessibility Ramps 2017/2018
Responsive Margin NOTICE TO BIDDERS Sealed bids will be received at the office of the City Engineer, located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111 until 2:00 p.m. local prevailing time, on Wednesday, April 11, 2018 for General Fund Accessibility Ramps 2017/2018, Job No. 105055. Bids delivered to any other […]
Job No. 660407: Steiner Aquatic Center Boiler Demolition and Replacement
Responsive Margin NOTICE TO BIDDERS Sealed bids will be received at the office of the City Engineer, located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111 until 2:00 p.m. local prevailing time, on Wednesday, April 11, 2018 for Steiner Aquatic Center Boiler Demolition and Replacement, Job No. 660407. Bids delivered to […]
Station Center | Reconstruction of 300 South: from 500 West to 600 West)
Responsive Margin Type of Work: Installation of new street with asphalt pavement, curb and gutter, and sidewalk. Public Way Restriction Area: All public way roadway excavations on the new subdivision street. Nature of Restriction: All utility excavations. Effective Date of Restriction: Date to be determined when street asphalt pavement is completed. Duration of Restriction: Seven (7) years from completion date […]
Victory Road Twin Homes: new street to intersect West Capitol Street at 640 North
Responsive Margin Type of Work: Installation of new street with asphalt pavement, curb and gutter, and sidewalk. Public Way Restriction Area: All public way roadway excavations on the new subdivision street. Nature of Restriction: All utility excavations. Effective Date of Restriction: Date to be determined when street asphalt pavement is completed. Duration of Restriction: Seven (7) years from completion date […]
Nineline Subdivision at 915 South: from Navajo Street to 1275 West
Responsive Margin Type of Work: Installation of new street with asphalt pavement. Public Way Restriction Area: All public way roadway excavations on the new subdivision street. Nature of Restriction: All utility excavations. Effective Date of Restriction: Date to be determined when street asphalt pavement is completed. Duration of Restriction: Seven (7) years from completion date of project.