Salt Lake City

Engineering

801-535-7961 | engineeringinfo@slcgov.com | 349 South 200 East, Suite 600

Notices

Six-Year Pavement Management Plan

Posted on: June 25th, 2019

The objective of this six-year pavement management plan is to extend the functional life of the City’s street network to the highest degree possible with available funds. This is accomplished through periodic pavement surface treatments (preservation and maintenance techniques) and major rehabilitation or reconstruction at appropriate times in the pavement life cycle. Contact US Please […]

Locating Utilities Ordinance

Posted on: January 30th, 2019

This City ordinance is now in effect. Please read it carefully or contact our permit officers if you have any questions. To obtain approval for a Permit to Work in the Public Way and perform directional boring, a copy of the door hanger (or flyer) of what will be delivered to each property owner along […]

Stormwater

Posted on: December 18th, 2018

For general stormwater questions please contact Greg Archuleta, Stormwater Quality Program Manager with the Public Utilities Department at 801-483-6821 or greg.archuleta@slcgov.com or visit this page. For questions about stormwater development plan submittals please contact Jason Draper at 801-483-6751 or jason.draper@slcgov.com or visit this page. 

2017 APWA Adopted Standards & Exceptions

Posted on: December 10th, 2018

In October 2018, Salt Lake City’s Engineering Division adopted the 2017 edition of the APWA Manual of Standard Plans and Manual of Standard Specifications, with these exceptions: The Engineering Division requires all construction in the public right-of-way to conform to these standards.  For questions about these standards or the exceptions, please contact the Engineering Division at: […]

2018-2019 Street Projects Public Notice

Posted on: September 25th, 2018

Salt Lake City CorporationCommunity and Neighborhoods / Engineering Division NOTICE OF STREET CONSTRUCTION AND RESURFACING PROJECTS In accordance with Salt Lake City Ordinance Number 14.32.080, notice is hereby given of upcoming street construction, reconstruction, and resurfacing projects anticipated to be performed by Salt Lake City during the three-year period beginning January 1, 2019. Projects listed below […]

Job No. 105055: General Fund Accessibility Ramps 2017/2018

Posted on: March 29th, 2018

NOTICE TO BIDDERS Sealed bids will be received at the office of the City Engineer, located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111 until  2:00 p.m. local prevailing time, on Wednesday, April 11, 2018  for General Fund Accessibility Ramps 2017/2018, Job No. 105055.  Bids delivered to any other location will […]

Job No. 660407: Steiner Aquatic Center Boiler Demolition and Replacement

Posted on: March 29th, 2018

NOTICE TO BIDDERS Sealed bids will be received at the office of the City Engineer, located at 349 South 200 East, Suite 600, Salt Lake City, Utah 84111 until  2:00 p.m. local prevailing time, on Wednesday, April 11, 2018 for Steiner Aquatic Center Boiler Demolition and Replacement, Job No. 660407.  Bids delivered to any other […]

Station Center | Reconstruction of 300 South: from 500 West to 600 West)

Posted on: March 23rd, 2018

Type of Work: Installation of new street with asphalt pavement, curb and gutter, and sidewalk. Public Way Restriction Area: All public way roadway excavations on the new subdivision street. Nature of Restriction: All utility excavations. Effective Date of Restriction: Date to be determined when street asphalt pavement is completed. Duration of Restriction: Seven (7) years from completion date of project.

Victory Road Twin Homes: new street to intersect West Capitol Street at 640 North

Posted on: March 23rd, 2018

Type of Work: Installation of new street with asphalt pavement, curb and gutter, and sidewalk. Public Way Restriction Area: All public way roadway excavations on the new subdivision street. Nature of Restriction: All utility excavations. Effective Date of Restriction: Date to be determined when street asphalt pavement is completed. Duration of Restriction: Seven (7) years from completion date of project.

Nineline Subdivision at 915 South: from Navajo Street to 1275 West

Posted on: March 23rd, 2018

Type of Work: Installation of new street with asphalt pavement. Public Way Restriction Area: All public way roadway excavations on the new subdivision street. Nature of Restriction: All utility excavations. Effective Date of Restriction: Date to be determined when street asphalt pavement is completed. Duration of Restriction: Seven (7) years from completion date of project.