Building Services

3-Digit Inspection Codes

Inspectors REQUIRE A SET OF PLANS TO BE ON SITE  

Please use the permit number associated with inspection type to schedule like inspections. You will need separate permits for each trade.

If your gas or electricity needs to be turned on please schedule a “CLEARANCE” inspection

Use these 3-digit codes to schedule inspections

General Building

101 Site Development

110 Concrete

111 Footings

112 Foundation/Walls, Columns

113 Post Tension Decks

114 Slabs / Driveways

115 Swimming Pools

120 Masonry

130 Framing

131 Shear wall

132 Penetration Assemblies

133 Suspended Ceilings

141 Roof Sheathing

142 Roof Dry-in

150 Weather Barrier

151 Insulation

152 Windows

153 Stucco / Lathing

154 Brick Veneer

160 Drywall

161 Shaft wall

170 Racking

180 Temporary Structures

192 Fencing

197 Consultation

199 Building Final

PLUMBING

210 Underground

220 Rough

221 Shower Pan

230 Gas Clearance

231 Gas Pipe Test

232 Medical Gas

240 Lawn Sprinkler

297 Consultation

299 Plumbing Final

ELECTRICAL

310 Underground

320 Rough

321 Above Ceiling

330 Clearance

331 Temporary Power

332 Change of Service

333 Power to Panel 397 Consultation

399 Electrical Final

MECHANICAL

410 Underground

420 Rough

421 Fireplace

423 Commercial Hood

424 Boiler

425 Chiller

426 Refrigeration

431 Gas Pipe Test

430 Gas Clearance

432 Damper Test

440 Radiant Heat

497 Consultation

499 Mechanical Final

FIRE SPRINKLER & SUPPRESSION

509 Clean Agent Final

510 Underground Rough

511 Underground Hydro Test

519 Underground Final

520 Fire Sprinkler Rough

521 Fire Sprinkler Hydro Test

529 Fire Sprinkler Final

530 Pump Rough

531 Pump Hydro 539 Fire Pump Final

549 Fire Hood Suppression

550 Standpipe Rough

551 Standpipe Hydro Test 559 Standpipe Final

579 Paint Booth Suppression 597 Consultation

FIRE ALARM

541 Fire Alarm Rough & Rated Assembly Fire Stop

596 Investigation

597 Consultation 599 Fire Alarm Final

DEMOLITON

810 Pre-Demolition

820 Post-Demolition

830 Landscaping

897 Consultation

899 Final Demolition

SOLAR

610 Mounting  

620 Electrical Rough 

630 Clearance

699 PV Final  

SIGNS

700 Consultation

702 Sign Process

710 Sign Footing

799 Sign Final

Re-inspection fees will apply if approved plans and manufacture’s installation instructions are not on site or access to complete the inspection is not provided.