1700 South: 1700 East to 1900 East Lane Striping

Responsive Margin

You are viewing archived content. Please note that this content is no longer updated and links may not work.

Overview

Several years ago, Salt Lake City reconstructed 1700 South in concrete between 1700 East and 1900 East but did not immediately repaint the roadway markings. In June 2022, the City striped new bike lanes in both directions and added a yellow centerline. This was made possible by narrowing traffic lanes and allowing parking only on the north side of the street, between the piped driveways.

Bike lanes already existed just west and east of this segment, as well as on the south leg of 1700 South, making this a vital connection for people biking to homes, schools, stores, parks, and other destinations. Most vehicles had historically parked on the north side of the street, typically around 10 to 12 cars. UTA Route 223 also operates along this stretch.

Striping design

Aerial view of 1700 South at the intersection with 1700 East in Salt Lake City, showing a proposed curved lane alignment. Design notes indicate a 15-foot curve length and a 100-foot lane shift. A red callout box notes that the centerline west of 1700 East appears to be 3 feet off from the north curb line and that final adjustments should be field-fit by Transportation staff.
Aerial view of the intersection at 1700 South and 1800 East in Salt Lake City. The image shows a residential neighborhood with single-family homes, driveways, and trees. The roadway has two travel lanes in each direction with a center turn lane. There are dashed markings for bike lanes and white painted crosswalks across 1800 East.
Aerial view of 1700 South at 1900 East in Salt Lake City, showing a proposed lane shift in the roadway. The image includes annotated design notes for a 5-foot lane shift tapering over 70 feet with a 50-foot straight section. The shift uses an existing no-parking zone on the north side of the street. Annotations specify taper lengths for speeds of 25 and 30 mph, and note that final adjustments will be field-fitted by Transportation staff. The goal is to align the westbound lanes with the east leg of the intersection.

View PDF of the lane striping design.

Contact us

Tom Millar, Project Manager

Email: Tom.Millar@slc.gov

Phone: 801-535-6134