400 South Street Design Changes (900 West – Redwood Road)

400 South Street Design Changes

900 West – Redwood Road

Project Overview

400 South Project Extents from 900 West to Redwood Road
400 South Project Extents from 900 West to Redwood Road

As part of a larger effort to enhance transit facilities in Salt Lake City, the Transportation Division is implementing a series of in-roadway bus boarding islands on 400 South, between 900 West and Redwood Road, in 2022.

What are bus boarding islands?

According to NACTO, these islands are “dedicated waiting and boarding areas for passengers.”

Example of a bus boarding island in San Francisco | July 30, 2013 (Photo Credit: SFMTA)
Example of a bus boarding island in San Francisco | July 30, 2013 (Photo Credit: SFMTA)

The islands serve three main purposes:

  1. Enhanced Transit By allowing the buses to stay in lane and riders to board at a more level access point, boarding the bus is easier and quicker. This facilitates more reliable transit service while keeping bus facilities, including benches and trashcans, within the right of way.
  2. Enhanced Bike Connection with the Jordan River Parkway By placing bike lanes behind the boarding islands bikes have more protection from cars on the road and won’t have to go around a stopped bus.
  3. Traffic Calming (Slowing Cars) The Westside 400 South corridor is home to two elementary schools, a regional trail system and numerous homes, shops and places of worship. While automobile travel is an important part of the road, pedestrian safety, reliable bus service and comfortable bike lanes could all use a boost in the area. Bus boarding islands in the roadway are a part of a larger strategy to transform this section of 400 South into a space for all modes of travel, where kids and transit riders are as comfortable and safe as someone in a car.

Where will the bus boarding islands be on 400 South?

Map of Approximate Bus Boarding Island Locations
Map of Approximate Bus Boarding Island Locations

Learn about other projects happening in the area at www.slc.gov/transportation/westsideprojects


Project Background & Funding

400 South, from I-15 to Redwood Road, received a chip seal surface treatment in summer of 2021. A chip seal adds another layer to the roadway surface, prolonging the life of the roadway by 5-7 years. The project team made very minor adjustments to the roadway. The configuration of two travel lanes and a center turn lane was kept in place, but narrowed very slightly to accommodate a buffer in the existing bike lane. 

This same corridor will experience bigger design changes in 2022 due to a Community Development Block Grant (CDBG) received in 2021.

Project Timeline

Draft DesignFall 2021
Final DesignSpring 2022
ConstructionSummer 2022


Contact

To submit a comment or question, please contact the Transportation Division.

Social Media | @SLCgov @SLCmoves 

Project Manager | Joe Taylor

Email | transportation@slcgov.com

Phone | 801-535-6630

Share "400 South Street Design Changes (900 West – Redwood Road)" to your social network: