Transportation

801-535-6630 | transportation@slc.gov

Projects

Emigration Creek Trail Connector

Posted on: March 20th, 2018

The Emigration Creek Trail Connector is a proposed paved, shared use pathway that would provide opportunities for utilitarian and recreational trips on foot and by bicycle between Wasatch Drive, Foothill Drive, and Sunnyside Avenue in the area near Bonneville Golf Course.

900 South Reconstruction (Lincoln Street to 1300 East)

Posted on: March 20th, 2018

In 2019, Salt Lake City reconstructed 900 South from Lincoln Street (950 East) to 1300 East. To repair this badly deteriorated street, the project reconstructed the road base, made minor utility improvements, and repaved in concrete.

9-Line Trail Extension Study

Posted on: March 20th, 2018

In 2016 and 2017, Salt Lake City studied how to extend the 9-Line Trail east to Emigration Canyon and west to the Surplus Canal, creating a plan for a pedestrian and bike corridor along 900 South.