Salt Lake City

Transportation

801-535-6630 | transportation@slcgov.com

Projects

Emigration Creek Trail Connector

Posted on: March 20th, 2018

The Emigration Creek Trail Connector is a proposed paved, shared use pathway that would provide opportunities for utilitarian and recreational trips on foot and by bicycle between Wasatch Drive, Foothill Drive, and Sunnyside Avenue (depending on alignment) in the area near Bonneville Golf Course.

900 South Reconstruction (Lincoln Street to 1300 East)

Posted on: March 20th, 2018

In 2019, Salt Lake City reconstructed 900 South from Lincoln Street (950 East) to 1300 East. To repair this badly deteriorated street, the project reconstructed the road base, made minor utility improvements, and repaved in concrete.

9-Line Trail Extension Study

Posted on: March 20th, 2018

In 2016 and 2017, Salt Lake City conducted a study to develop a conceptual design and implementation strategy for a pedestrian and bicycle corridor along 900 South between the mouth of Emigration Canyon and the Surplus Canal, extending the existing 9-Line Trail both eastward and westward.